Progress continues on every aspect of the
project, even off site in the workshops of the vendors.
STAINED GLASS
Bishop, Fr. Kevin, and Gino from Botti Studios discuss the process of creating standoffs to provide ventilation between the stained glass and the protective windows.
The rose stained glass windows above the main entrance doors are removed, templeted, packaged, and sent to the Botti Studio for restoration.
Stained glass windows that have been restored at the Botti Studio
are installed, prepped and caulked.
Condensation drip pans are installed.
D
Stained glass windows receive the first preliminary cleaning.
Protective glazing arrives from the Botti Studio.
ORGAN RESTORATION
Open flutes before and after washing at Peragallo's Studio.
John Z. removes the old cabling.
Windchest being releathered.
ELECTRICAL (Victor Zucchi & Son sub-contractor)
New Main panel under construction as the new cables are installed in the new conduit,
New junction boxes are intalled in the chapel for the future chandeliers.
New lighting panels are installed.
Ditches are dug to install the underground cables and footings for the new exterior lighting.
PEW RESTORATION
The Keck Group finished the stripping of the existing pews.
The existing pew backs are stained.
Antique confessionals purchased from the Archdiocese of Newark are stained.