During the design process, further investigations and exploratory work was required to assess the existing conditions and reveal the life safety hazards that needed to be rectified.
INVESTIGATIONS & EXPLORATORY WORK
Bishop Serratelli, Sr. Mary Edwards, Msgr. Mark Giordani, Msgr. Mark Condon, and
Art Sikula, architect, make inspections
Existing bell & clock system was inspected by Verdin Company
Original bell ringing mechanism was abandoned in place
Clangers on the right side installed at a previous renovation are still in good working
order and need only maintenance
Floor was removed for the investigation of choir loft footings
Stained Glass Window Inspection
Abandoned Original Clock Mechanism
.